Below are some projects managed and completed in the commercial sector by Unlimited Flooring Sheffield.
Please click on the thumbnail images to view the details of the floorings installed.

Plasmor building products, Knottingley - Phase 2
We refurbished the new shower block, canteen and locker room.
Installed was Altro unity and Polyflor Hydro to the shower floor, which is a raised embossed floor designed for wet areas.

All the substrate had a coat of added MVS dpm and Ardex NA latex screed after the floor was grind to remove old latex and contaminants.

       

Plasmor building products, Knottingley 
Recently we refurbished the complete offices including accounts and reception with JHS stripe tiles approx 600m2. The old flooring was removed and we had to install around existing office furniture.
Staircase and corridors was also remodelled with Polyflor Expona random vinyl planks laid on Eurocoll smoothing compound, staircase nosing supplied from quantum. These works was completed at the weekend to minimise disruption.
     
                

Burnt Tree Vehicle Rental in Derby - 
Recently installed 100m2 of Polysafe 2mm safety flooring throughout there newly refurbished offices and reception. The existing concrete floors where grind to remove all traces of damaged concrete, the floors all primed and a latex screed by Mapei was used to level the floors.  Once all fully dried the flooring was able to be installed. As a late request, we installed a wipe off mat to the front entrance

 

City of Sheffield
40m2 of sidec resin floor with added flake the newly formed Wet Areas and Toilet Facilities.



Wesley Hall Church, Crookes, Sheffield
Unlimited flooring was approached to repair and re-seal the hall flooring rather than replace.
The area is large approx 150 m2, we initially stripped back the old polish using a floor stripper and the use of commercial floor stripping machines using green pads.Once the floor was thoroughly scrubbed clean, the dirty water and slurry was removed with a large wet vacuum.

When the floor had dried, we then repaired the vinyl joints by heat welding new weld and thus making the joints watertight again.

A 2 coats of commercial floor seal was used and allowed to dry giving the surface a hard and impregnable finish


Wesley Hall Church, Crookes, Sheffield
- 80m2 of itec pur wood plank vinyl flooring. Existing flooring uplifted and removed, then the subfloor is boarded with 6mm plyboard, all joints skimmed with ardex feather finish.
When completed, all joints heat welded and the perimeter edges silicone sealed.



Capital 1, IT refurbishment, Nottingham Centre
- We removed all the old flooring, completely re-screeded the floor and laid new carpet tiles in a oval like shape. Nora rubber flooring was installed around the carpet with customised lettering installed to create a contemporary but modern feel. As the carpet was thicker than the rubber, we had to screed the to make sure all finishes where flush.