Hotel / Leisure

Below are some projects managed and completed in the Hotel and Leisure sectors by Unlimited Flooring Sheffield.
Please click on the thumbnail images to view the details of the floorings installed.

Flares nightclub, Doncaster

Recently remodelled, we installed new flooring to the ladies wc, bar servery, trade areas and dance floors. The old floors removed and the substrate repaired. The main trade areas some of the timber had to be cut away and renewed. Vip and seating areas had new carpets to enhance the new look. The end result  was a fresh new look for this busy chain of clubs.

    

      

Greene King Restaurants - The Snipe, Sutton in Ashfield 

Complete remodel of this popular restaurant. Installed was 200m2 of Calderdale carpeting , new bar flooring and Karndean LVT planks to the dining area and around wall columns which created a unique finish
        
  


Premier Inn, Butterley Park, Ripley

We recently carried out a 20 bedroom flooring installation to a new extension added to the existing hotel.
Installing new carpeting including the corridors which,  incorporates the newly introduced border style finish.
The staff staircase was finished with a safety floor and new stair nosings.

The client also requested the existing premier inn reception be refurbished with polyflor camaro ceramic effect tiles with a feature grout added.
The existing ceramic tiles was removed and the entire subfloor was screeded through the night to minimise disruption.
New carpet tiles was installed behind the reception desk , new carpet to the seating area and entrance matting was replaced.  

    

    

Greene King pub co, Hungry Horse restaurants

The Queensway, Scunthorpe.
We installed 250m2 of calderdale bespoke carpeting throughout and 100m2 of Altro stronghold to the kitchen, bar and back areas.
     
   
Green King, Hungry Horse theme Restaurants
Newcastle and Nottingham, installed calderdale bespoke carpets and underfelt throughout 


Fox and Hounds at Batley (Punch Taverns)
All floors prior to new floorcoverings, fully prepared with Mapei Latex Screed
Installed Forbo Marmoleum Vinyl Tiles in Chequerboard effect
New Altro designer safety flooring to the ladies wc, bar servery and kitchen floor 
Calderdale carpeting throughout the dining area.


Greene King Restaurant, Cramlington

Recently completed a brand new fit out of this popular chain of Hungry Horse Restaurant. We installed 300 meter square of traditional fit carpet from Calderdale Carpets. Also installed was 300 meter square of Altro stronghold 3 mm SafetyFloor to the kitchen, bar services, glass wash and rear corridor.

Prior to installing the new safety floor, all the concrete subfloors received a Laybond dpm to prevent moisture affecting the screed and Altro products. All completed on time and to great reviews.

Greene King Restaurant, Rosedene, Sunderland
400m2 of new carpets throughout from Wilton royal carpets to create this themed restaurant from greene King. Also installed was karndean vinyl planking to create a small and neat bar apron.

Wirksworth Leisure Centre for Derbyshire Dales Council
We was asked to re-install a new shower floor to the ladies and gents shower areas. The existing was torn and in a general poor condition. The existing floor covering was ripped up and allowed to dry for 24 hours. The existing concrete subfloor was in a reasonable condition and after an initial grinding of the concrete we used Ardex feather finish to create a smooth surface to install on. We then chose Polyflor Hydro which is an embossed flooring designed for shower floors. The perimeter edges was site formed and great attention as given to the welded joints. The flooring was dressed into the drain covers and sealed. The drain covers where then screwed over the flooring.


Premier Inn's Restaurant, Leeds, new carpet and solid wood floor sanded and sealed, completed on a recent shut down




Punch Taverns Storeyteller, Rotherham
  We installed 280m2 of Axminster from Wilton Carpets, 150m2 of Karndean Art select wood planking.  All installations completed on a tight schedule working with the main contractor.