Mercure Hotel, Chester

Shower and changing room floor replacement, the existing flooring was split and generally in poor condition.
The old flooring ripped up, the floor dried and a moisture suppressant applied to control water within the concrete floor.

New flooring chosen was Polyflor Hydro, high slip resistance for wet rooms and shower areas.
The flooring was dressed into thenew shower traps and sealed.

We used moisture resistant flooring adhesive to make sure all remains water tight and secure.
Safe and foot comfort with new flooring and detailed installation.