rECENT pROJECTS

Vets 4 pets, Rotherham

The reception area and four consultation rooms received new flooring installations. Existing flooring was removed, the substrate smoothed with a flooring compound, and then new flooring was installed with coved upstands and heat-welded joints to ensure hygiene and ease of cleaning.

NHS walk in centre, Sheffield

New staircase flooring

Removed the old flooring and prepared the substrate with Ardex feather finish.

Once dried we install Polysafe safety flooring with non slip properties, to the entire stair and landings.

Mha Starr Hills Care Home

40 bedrooms and ensuites, communal shower and bathrooms, Dining room, office space and communal corridors 

New re- model and refurbishment throughout, all the flooring was ripped up and removed, new carpeting throughout, carpet used was Danfloor equinox impervious flooring, fully adhered.

Updates

FEATURED NEWS

Our Credentials

Contact Us