Big yellow storage unit,
Torquay
Challenge on this particular site, we had a raised metal access floor to cover in linoleum.
So we installed 6mm plyboard, fastened with our coiled nailer and fixed with 20mm ring shank nails.
Once all boarded we installed linoleum from Forbo, to the reception and entrance, a natural product, extremely hard wearing and manufactured from natural products.
Reception was extended and had a liquid epoxy dpm installed due to the fast turnaround time.
Vinyl floor finish to the kitchen and toilets.
#ardex #forbo #linoleum #big yellow