Milestone Child Health Care Centre, Sheffield

A recent challenging project.
The original floor had to be removed exposing a raised access floor with 2mm steel surface usually used as a computer room.
The whole floor was overlaid with 6mm ply board which we had to screw down with a self feeding screw guns.
Once the boarding was complete the whole was screened with Ardex feather finish.
This was quite a lengthy process as we had 300m2 to complete.
Once this had dried the flooring was installed.
We specified polyflor astral for the slip resistance and striking colours and design.