TA Centre, Leicester
80m2 of 3mm Altro stronghold installed throughout the refurbished shower block. Existing floors primed and latex screeded with Uzin gold moisture screed for damp sub-floors. The flooring was dressed into all the floor drains and coved at the perimeter edge.